Progress as promised.
Hubs, shields and spindles assembled and torqued to 95 ftlbs.
Sensors are a bit pinched against the new spindles. I'll try and do something before caliper install.
Old upper control arms in the pic too. +1 for new and shiny stuff
Differential mounts, skid plate, cross members all torqued to spec. Took a while.
Air ratchet really helps on that back cross member.. Tight space with the diff right there.
I was then able to move on once all bolts were safely tightened.
Lower control arms installed, and I greased the upped and lower ball joint.
[possibly over pumped, but they are holding]
Yeah it's really dirty and dusty after sitting for 5-6 weeks now in the garage..
After both sides were completed it was time to mount the spindles.
Torqued ball joints to spec. Lost a cotter pin. Banged my head on UCA. Many curse words were spoken. :banghead:
Spindles & hubs getting jacked into place.
Mounted
Tie-rod test fit. Alignment is terribad at the moment.. but nice to see it all together.
Next comes the NTBD Arms... tomorrow.