Got the spindles. Ended up calling Tim and getting them from him. Lesson learned there.
Coil coils down to 6" drop with spindles. Haven't taken it off the hoist, but its all back together with the hotchkis back on.
Spindles Primed and Painted
Control arms loaded with poly bushings, and MCG 16" balljoint setup
Coil coils down to 6" drop with spindles. Haven't taken it off the hoist, but its all back together with the hotchkis back on.
Spindles Primed and Painted
Control arms loaded with poly bushings, and MCG 16" balljoint setup