Cornell, send me info on that cutout install
4" MBRP frontpipe, SS 4" ID to 4" ID fitting, SS Race Ready 4" OD y pipe, 4" SS Race Ready turn down, 4" MHT electric cutout, 4" ID to 3.5" ID reducer. Took it to Midas to get welded up (Don't be fooled, the guy that owns it used to work with Cognito designing stuff and he's a BAMF plus he used to hang out with my Dad in highschool)
That Gauge setup turned out awesome Corny...Im proud
Thanks, I bought stuff to do it again with fiberglass instead of bondo. It hasn't cracked or anything I just want to shift the gauges over to the right about an inch.
Wannnnntttt gauge pod!!!!
Once I build the new one I will probably sell my first one just to recoup the cost of my other pieces I bought (45 bucks or so)
lmao at jack-rag