81 C10 swb

Finish the 4 link and rear notch. Drop the frame horns down 2 inches to accommodate for the body drop. We need to sit the motor and trans in to see how much we may need to tunnel the cab. But putting the cab on just made us want to get the ball rolling. I have to still fold the pinch weld as well lol.
 
3a339f23fb3b4a55f4464a512a19513d.jpg
55e2dc89c0f1bdb6e5f5630f9413dce3.jpg
8afa80e471dce0024a33865b312cfafa.jpg


Got the notches in and cut out, still gotta finish welding them in all the way and build a bridge.
 
Lol true, pb recommends 2-2.5" drop spindles and I thought these may be too much. It really affects the geometry during the lift cycle. Good news is that if I get the cpp spindles it should take another half inch or so out of the track width.

Also they're starting to make my wheels in a 22x11 so I may order me 2 in the spring.
 
f4eb17bcc5c911302ce6c05bbd73db99.jpg
fd0f1a8231fb8e1f9f92a8c9eeaecf52.jpg

My buddy made a new crossmember to mount the upper bars on. He sat it in place today to take some measurements. The main thing is to make sure the driveshaft will clear when it lays out.